Spectra-precision Survey Pro v3.80 Recon iPAQ User Manual Uživatelský manuál Strana 111

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 178
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 110
Road Layout
103
33.
We now need to repeat the above steps for the right side of the
road. Tap
<End>
in the
R
ight column to select that side of the
road and then tap the button to open the Add Right Super
Elevation screen.
34.
Enter the following data just as you did for the left
side of the road and then tap OK.
Start Station:
1+0
End Station:
1+25
Start Slope:
-2
End Slope:
-8
(notice this is a negative value)
Parabolic Transition Start:
0.0
Parabolic Transition End:
0.0
Hinge on:
35.
With
<End>
selected in the
R
ight column, tap the
button again to add the final super
elevation.
36.
Enter the following data to describe the second
super elevation on the right side of the road and
then tap OK.
Start Station:
2+0
End Station:
2+25
Start Slope:
-8
End Slope:
-2
Parabolic Transition Start:
0.0
Parabolic Transition End:
0.0
Hinge on:
37.
This completes the definition for an entire road
including templates, widenings and super
elevations. To make sure there are no errors, tap
. You should get a message stating
success.
38.
Tap OK
to save the road.
You are now ready to stake the road in the field. Close any open
windows to return to the Main Menu
.
Zobrazit stránku 110
1 2 ... 106 107 108 109 110 111 112 113 114 115 116 ... 177 178

Komentáře k této Příručce

Žádné komentáře