Spectra-precision Survey Pro v3.80 Recon iPAQ Reference Manual Uživatelský manuál Strana 230

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 261
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 229
Survey Pro Reference Manual
R-224
Station Interval
: is the value that is added to the
Station
to Stake
after the button is pressed.
: advances the
Station to Stake
by the
Station Interval
.
Note: If the
Stake Corners
option is selected in the
Stakeout Settings screen, the button will
also stop at any horizontal or vertical alignment node,
and the beginning and end of any widening and super
elevation that falls within the interval.
, : These buttons are used to select the
particular node, or an offset to it, from your road profile
that you wish to stake. The segment name at the selected node is
also displayed. If staking the centerline with an offset, the side of the
road that the offset occurs is also displayed.
Offset
: When checked, allows you to specify an offset distance to
stake as opposed to staking the actual node locations.
Note: A positive value offset is applied at the specified distance from
each node away from the centerline. A negative value offset is
applied at the specified distance from each node toward the
centerline.
Note: If an offset occurs past the edge of the road, no vertical or cut /
fill information will be computed for that point.
: accesses the Backsight Setup
screen (Page R-78).
: returns to the previous screen.
: takes you to the next Stake Road
screen where the direction
and distance information to the stake point is displayed.
Zobrazit stránku 229
1 2 ... 225 226 227 228 229 230 231 232 233 234 235 ... 260 261

Komentáře k této Příručce

Žádné komentáře