
Survey Pro Reference Manual
R-112
: opens the next Stake List of Points
screen where the
current
Design Point
can be staked.
Note: The screens available after tapping or are
identical to Screens Two and Three in the Stake Points routine and
are described on pages R-107 through R-108.
Edit Point List
or
Edit List…
The Edit Point List screen is used to modify the
existing point list.
: removes the selected point from the
point list.
: removes all the points from the point
list.
: is available only when the screen is
accessed with the button. This will
automatically select the point in the point list
that is nearest to the previously staked point,
which is the selected point when the screen if first accessed.
/ : will insert the point specified in the
corresponding field above the point selected in the point list. When
<End>
is selected, the point is appended to the end of the list.
: is available only when the screen is accessed with the
button. This is used to stake the point currently selected in
the point list.
Komentáře k této Příručce