Since templates used in Slope Staking help define all grades into the centerline from the slope stake, it makes sense to
focus on the su/jointfilesconvert/1445534/bgrades that are built by the dozer, motor grader or trimmer. Thus, despite all the surface grades
involved, there are only three distinct grades in this example curb and gutter template between centerline and the pivot
point of the cut and fill slopes: 12.00 at -2% (su/jointfilesconvert/1445534/bgrade at back of curb), 0.01 horizontal and 1 vertical, and 8.00 at 4%.
For the
Vertical
method, some positive horizontal distances must be entered, such as 0.01 or 0.001. By pressing
Add
in
the dialog, we can enter the first two grades.
Downhill slopes, going out from the middle of the template, are entered as negatives. Note that it is necessary to enter
an ID for each break point in the template. This helps identify the description of the grade on the progressive slope
stake report (e.g. from the outside going in, 8’ at -4% to TC, 0.01’ at -1 vertical to EP, 12’ at 2% to CL). The shoulder
slope going out (8 at 4%) is entered similarly, as above. The
Input-Edit Template
dialog now appears.